![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Projects - Archive 2007 The board of Energy Freedom Pioneers has a vision for the property known as Camp Pedricktown - Block 45, Lot 5. This industrial site is ideally situated close to key North-South and East-West truck routes, as well as the Delaware River shipping channel and key customers and suppliers on the East Coast. The mission is to renovate, manage and operate a high tech industrial park located minutes from major highways, waterways, railways, refineries, power generation stations and freight terminals including export terminals, that is occupied by thriving alternative energy manufacturers that mass produce affordable energy products. Specific objectives include:
PROJECT IMPROVEMENTS AND PHASING The Project shall consist of the refurbishment of existing structures and the construction of manufacturing, office commercial and flex industrial uses. The refurbishment of the vacant existing structures and infrastructures will be accomplished in Phase I. The refurbishment of the leased existing structures and infrastructures will be accomplished in Phase II. The new construction of manufacturing, commercial and flex industrial uses will be accomplished in Phase III.
There are currently eight occupied and leased structures that require minor refurbishment and upgrades, primarily to the exterior of the buildings to create a uniform appearance. These buildings are in various stages of disrepair and will be remodeled to ensure that all buildings within the complex have a common façade and exterior. These buildings are shown in blue below:
Phase III - New Development and Construction There are approximately 30 acres of property that have no existing structures and that are suitable for development and new construction. The total plan for this phase of the property improvement has not yet been fully developed. The portions of the property that have been identified for new development and construction during Phase III are indicated on the map below in orange and are as follows:
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Energy Freedom Pioneers Inc. © 2007 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||